
C-TS422-2021 exam questions for practice in 2023 Updated 82 Questions
Updated Dec-2023 Premium C-TS422-2021 Exam Engine pdf - Download Free Updated 82 Questions
SAP C_TS422_2021 exam consists of 80 multiple-choice questions and has a time limit of 180 minutes. C-TS422-2021 exam is available in English and is offered through the SAP Certification Hub. Candidates must score a minimum of 64% to pass the exam and earn the SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing 2021 certification.
SAP C-TS422-2021 exam consists of 80 multiple choice and multiple response questions that are to be completed within a time frame of 180 minutes. C-TS422-2021 exam is available in the English language and is conducted in a proctored environment. C-TS422-2021 exam fee is $550, and candidates can register for the exam through the SAP website.
SAP C_TS422_2021 exam is designed to validate the skills and knowledge of individuals who are interested in pursuing a career in SAP S/4HANA production planning and manufacturing. SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing 2021 certification exam is designed to assess the individual's ability to work with the SAP S/4HANA Production Planning and Manufacturing module, including the ability to configure, implement, and maintain this module in SAP S/4HANA environments.
NEW QUESTION # 24
Why would you use phantom assemblies?
- A. To make the assignment of components easier
- B. To reduce the number of material masters
- C. To simplify the structure of bills of materials
- D. To increase the number of planning levels
- E. To reduce the number of changes required in bills of materials
Answer: A,C,E
NEW QUESTION # 25
How can you carry out cost object controlling for production orders?
- A. Milestone-related
- B. Cost-related
- C. Product-related
- D. Order-related
Answer: C,D
NEW QUESTION # 26
You want to schedule an operation finitely, without moving other operations. Which scheduing strategy do you select?
- A. Squeeze in
- B. Schedule in working time only
- C. Insert operation
- D. Find slot
Answer: D
NEW QUESTION # 27
You want to create a production order from a planned order. What methods could you use?
- A. Partial conversion
- B. Collective conversion
- C. Order release
- D. Combined conversion
Answer: A,B
NEW QUESTION # 28
Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider?
- A. The number of leading zeros for internal numbers is client-specific.
- B. The display template for material numbers applies to all clients.
- C. The maximum mater all number length is 40 for external numbers and 18 for internal numbers
- D. In Customizing you can decide by material type whether to use the long material number.
Answer: B,C
NEW QUESTION # 29
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?
- A. Make-to-stock production (10)
- B. Make-to-order production (20)
- C. Planning with final assembly (40)
- D. Planning without final assembly (50)
Answer: C
NEW QUESTION # 30
You want to insert an operatio at a certain time on work center. The planning direction is forward. The disired dispatching time concides with an operation that has previously been dispatched. How does the insertion take place?
- A. The previously dispatched operation stays as is; the new operation is inserted before the the dispatched operation.
- B. The new operation is inserted at the desired time; the previously dispatched operation is moved backward.
- C. The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
- D. The previously dispatched operation stays as is; the new operation is inserted after the the dispatched operation.
Answer: B
NEW QUESTION # 31
The MRP run detected a shortage of a materila that you sorce from an external supplier in full pallets. How can you make sure you will only recive full pallets?
- A. Use the MRP type for vendor managed inventory.
- B. Use the fixed lot procedure.
- C. Use the minimum order quantity
- D. Use the reorder point
Answer: B
NEW QUESTION # 32
Which of the following is valid sequence of the main activities in production order processing?
- A. Creation, availability check, release, material widrawal, confirmation
- B. Creation, release, printing, goods issue, confirmation, goods receipt
- C. Creation, printing, release, goods issue, confirmation, goods receipt
- D. Creation, release, settlement, goods issue, confirmation, goods receipt
Answer: A,B
NEW QUESTION # 33
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network?
- A. SAP Hybris
- B. SAP Fieldglass
- C. SAP Concur
- D. SAP SuccessFactors
- E. SAP Ariba
Answer: B,C,E
NEW QUESTION # 34
What happens to this dependent requirement when you convert the planned order into a production order?
- A. They are converted into a production order.
- B. They are converted into a planned order.
- C. They are converted into a schedule line.
- D. They are converted into a reservation.
Answer: D
NEW QUESTION # 35
How would you define pegging in the context of Advanced Planning?
- A. An evaluation to verify if there are material or capacity shortages in the network after the production planning run.
- B. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run
- C. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements
- D. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements
Answer: D
NEW QUESTION # 36
Advanced Planning uses master data and transaction data from SAP S/4HANA. In which data objects can you set the advanced planning flag?
- A. Production version
- B. Plant
- C. Work center
- D. Material
Answer: C,D
NEW QUESTION # 37
You want to use capacity availability checks for production orders. Which settings have to be made for this?
- A. The Relevant for Finite Scheduling indicator must be set
- B. A checking rule must be assigned in the checking control
- C. An overall profile must be assigned in the checking control.
- D. The PRT Availability Check must be set in the checking control.
Answer: A,C
NEW QUESTION # 38
You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?
- A. Planning with final assembly (40)
- B. Make-to-order production (20)
- C. Planning at assembly level (70)
- D. Planning without final assembly (50)
Answer: D
NEW QUESTION # 39
Your quality department detect a deviation in a raw material batch. Unfortunately, this batch has already been used in producion. How can you indentify all affected finish goods stocks?
- A. Use the material staging report.
- B. Use the material where-used report.
- C. Use batch determination.
- D. Use the batch information cockpit.
Answer: D
NEW QUESTION # 40
During production order creation, several valid production versions are found. How does the system choose the production version?
- A. Lot size or material cost
- B. Planned order or material number
- C. Valid period or sale order
- D. Alphanumeric or quota arrangement
Answer: D
NEW QUESTION # 41
An issue storage location was NOT found through the work center, bill of material(BOM) item, or material master. What determines whether the storage location can be derived from the production version?
- A. MRP group
- B. Plants parameters
- C. MRP controller
- D. MRP profile
Answer: A
NEW QUESTION # 42
Which of the following questions do you have to answer before you start creating a BOM?
- A. What status does the BOM have?
- B. Which Valid To information is necessary?
- C. Is the material type allowed in the BOM?
- D. In which storage location is the BOM required?
Answer: B,C
NEW QUESTION # 43
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?
- A. When multiple planned orders exist on one resource
- B. When multiple production versions are maintained for one product
- C. When alternate resources are used within one operation
- D. When multiple operations are maintained for one product
Answer: C
NEW QUESTION # 44
Your proyect team decides to use a make-to-order planning strategy for strategic in discrete manufacturing.
What is the impact of this decision?
- A. Production orders specific stock is created
- B. Net requirement calcualtion is sales-order specific.
- C. A sales-order-specific planning run is required.
- D. Storage location MRP areas are required.
Answer: A,B,C
NEW QUESTION # 45
You want to set up a make-to-order planing scenario for finished material. The bil of material contains two components: one should be procured for each sales order individually, the other one shold be procured jointly for all independent requirements. Forcasting for the finished product is NOT possible. Which setting do you make to achive this?
- A. Choose planning strategy 20 (Make-to-order) and select corresponding Invidual/collective indicator
- B. Choose planning strategy 50 (Planning whthout final assembly) and select corresponding Invidual/collective indicator
- C. Choose planning strategy 20 (Make-to-order) and select corresponding Mixed MRP indicator
- D. Choose planning strategy 50 (Planning whthout final assembly) and select corresponding Mixed MRP indicator
Answer: B
NEW QUESTION # 46
For what production type are production orders used?
- A. Process manufacturing processes
- B. Period and quantity-oriented production
- C. Discrete manufacturing processes
- D. Replenishment controlled by control cycles
Answer: C
NEW QUESTION # 47
You have a schedule agreement whit a vendor. You want classic MRP to automatically create schedule lines in case of material shortage.
What must you do?
- A. Add the agreement to the quota arrangement and mark it for MRP revalance.
- B. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
- C. Set the creation indicator for purchase requisitions on initial screen of MRP run
- D. Add the agreement to the source list and mark it for MRP revalance.
Answer: B,D
NEW QUESTION # 48
......
Authentic C-TS422-2021 Dumps With 100% Passing Rate Practice Tests Dumps: https://vcetorrent.passreview.com/C-TS422-2021-exam-questions.html