NEW QUESTION # 45
What are the relevant use cases for helper key figures?Note: There are 2 correct answers to this questions.
- A. Used to break down a large calculation into manageable subcalculations
- B. Used at any level of calculation level except the Request Level
- C. Used when you have more than three inputs at different planning levels in one calculation
- D. Used by end-users in planning views to help visualize cross-period calculations
Answer: A,C
NEW QUESTION # 46
You are setting up planing with lot sizes.What are some of the properties of lot sizes that you need to be aware of?Note: There are 2 correct answers to this question.
- A. Lot sizes are applicable for production and handling quantities.
- B. Periodic lot size setting overrides the minimum lot size.
- C. Lot sizes are applicable for production and transportation quantities.
- D. Lot sizes are time-independent master data settings.
Answer: A,D
NEW QUESTION # 47
Which applications are present in the sample model SAPIBP1?Note: There are 3 correct answers to this question.
- A. Sales and Operations Planning
- B. Demand Driven Replenishment
- C. Response Planning
- D. Demand Sensing
- E. Inventory Optimization
Answer: A,D,E
NEW QUESTION # 48
Which of the following approaches could you take to reduce run times of an optimizer?Note: There are
3 correct answers to this question.
- A. Split into multiple planning areas to support weekly vs. daily planning needs.
- B. Use non-overlapping networks by using subnetwork ID maintained at Location-Products to reduce the size of the problem.
- C. Increase the use of incremental lot size beyond the frozen horizon.
- D. Keep the number of fairshare segments small.
- E. Avoid using telescopic time buckets.
Answer: A,B,E
NEW QUESTION # 49
For your project, you create a new planning area and consider how to create analytics and alerts for it.How can you create these objects?
- A. Merge analytics and alerts into a new planning area from any sample planning area.
- B. Use the option for copying analytics and alerts into the new planning area from the existing custom planning area.
- C. Create analytics and alerts in the new planning area from scratch using the Intelligent Visibility application.
- D. Use the option for copying analytics and alerts when creating a new planning area from the sample SAPIBP1.
Answer: D
NEW QUESTION # 50
What do you need to be aware of when using multiple pairs of key figures in one copy operator? Note:
There are 2 correct answers to this question.
- A. Copying multiple key figures can be processed sequentially.
- B. If necessary target key figures values are disaggregated.
- C. If necessary source key figures values are disaggregated.
- D. Copying multiple key figures on different planning levels is not possible.
Answer: A,B
NEW QUESTION # 51
Which of the following are inputs to Demand Sensing with Gradient Boosting (Full) algorithm?Note:
There are 2 correct answers to this question.
- A. Recommended Safety Stocks from Multistage Inventory Optimization
- B. Forecast Error CV Calculated by Manage Forecast Error Calculations app
- C. Sales Order Quantities (both historical and future open orders)
- D. Future Consensus Forecasts and Lagged Forecast Snapshots
Answer: A,D
NEW QUESTION # 52
You are adding a value-based filter to a planning view.Which of the following conditions apply?Note: There are 3 correct answers to this question.
- A. You can add (or delete) planning objects to a planning view after these filters are applied.
- B. These filters are always applied based on the values stored in the database.
- C. You can only apply one value-based filter per planning view.
- D. These filters can be used together with attribute totals in the same planning view.
- E. The alerts dashboard is not available if a value-based filter is set for the open planning view.
Answer: B,C,E
NEW QUESTION # 53
Which of the following are capabilities of the Manage Forecast Error Calculations - Inventory Optimization app?Note: There are 2 correct answers to this question.
- A. Adjust Safety Stock Recommendations based on forecast error CV input
- B. Identifiy intermittent demand for Forecast Error CV calculations
- C. Adjust for forecast bias in Forecast Error CV calculations
- D. Propagate forecast error to upstream locations in a supply chain network
Answer: A,C
NEW QUESTION # 54
You are working to realign the data due to a recent warehouse closure.What should you be aware of in regards to the realignment steps settings?Note: There are 2 correct answers to this question.
- A. The name of the realignment step should be no longer than 20 characters.
- B. The number of steps in the realignment run is limited to 255.
- C. You must mark the realignment step as "shared" and assign the steps to users.
- D. A realignment step can change master data, planning objects and key figures.
Answer: C,D
NEW QUESTION # 55
You are adding a value-based filter to a planning view.Which of the following conditions apply?Note:
There are 3 correct answers to this question.
- A. You can add (or delete) planning objects to a planning view after these filters are applied.
- B. These filters are always applied based on the values stored in the database.
- C. You can only apply one value-based filter per planning view.
- D. These filters can be used together with attribute totals in the same planning view.
- E. The alerts dashboard is not available if a value-based filter is set for the open planning view.
Answer: B,C,E
NEW QUESTION # 56
You created a key figure and want to add calculations.Which of the following rules do you consider?Note: There are 2 correct answers to this question.
- A. All key figure calculations have calculation inputs, which can be marked as stored or calculated.
- B. Key figures can be calculated across different planning levels.
- C. Aggregation calculations using SUM or MAX functions must be based on a higher aggregation level.
- D. The calculation chain for a key figure must always result in a calculated key figure.
Answer: A,B
NEW QUESTION # 57
Which of the following key functions are supported by SAP IBP for sales and operations?Note: There are
2 correct answers to this question.
- A. Multi-Level Supply Planning Heuristics
- B. Scenario analysis for operational supply planning
- C. Simple statistical forecast
- D. Time series analysis
Answer: A,C
NEW QUESTION # 58
You are working on a mid-range plan that spans the seasonal peak and you are evaluating the need for additional crewing.Which of the following parameters can you model to plan production with extra shift(s)?
- A. Adjusted production interactive values
- B. Production source validity at the start of seasonal peak
- C. Capacity expansion with additional costs
- D. Incremental production values
Answer: C
NEW QUESTION # 59
For which of the following application jobs can you enter planning filters as parameters?Note: There are 2 correct answers to this question.
- A. Create Time Periods for Time Profiles
- B. Purge Master Data
- C. Purge Key Figure Data
- D. Purge Non-Conforming Data
Answer: B,C
NEW QUESTION # 60
The S&OP Operator Profiles app is used to configure different types of algorithms.Which algorithm- specific settings are unique for only the Time Series-based Supply Optimizer?Note: There are 2 correct answers to this question.
- A. Time profile level
- B. Global cost factors
- C. Processing mode
- D. Discretization
Answer: B,C
NEW QUESTION # 61
How can the SAP IBP scenario modeling functionality support business users in the S&OP planning cycle?Note: There are 2 correct answers to this question.
- A. Simulate statistical forecast at the Demand Review stage
- B. Model inventory turns based on Target Safety stocks
- C. Simulate demand sensing inputs for Supply Review
- D. Simulate heuristics run in Supply Review stage
Answer: A,D
NEW QUESTION # 62
Which of the following are functions of SAP IBP for demand?Note: There are 2 correct answers to this question.
- A. Demand sensing of demand data using predictive analytics tools
- B. Consideration of demand-driven analysis for buffer positioning.
- C. Embedded, on-the-fly demand analytics
- D. Detailed statistical analysis of demand data using predictive analytics tools
Answer: C,D
NEW QUESTION # 63
What are some of the available ABC segmentation methods in SAP IBP?Note: There are 2 correct answers to this question.
- A. By Number of Items (Sorted Average)
- B. By Number of Items (Sorted Values)
- C. By Pareto Principle (Sorted and Calculated Values)
- D. By Pareto Principle (Sorted and Cumulated %)
Answer: B,C
NEW QUESTION # 64
Where can the results of a Time Series Analysis be used?Note: There are 2 correct answers to this question.
- A. During XYZ segmentation in the Manage ABC/XYZ Segmentation Rules app
- B. In the Manage Forecast Error Calculations app - Demand Planning app to calculate the Forecast Error CV
- C. In Global (multi-stage) Inventory Optimization to calculate time-phased Recommended Safety Stock Outputs
- D. In the Microsoft Excel add-in, where you can use them to limit and filter your planning views
Answer: A,C
NEW QUESTION # 65
Which of the following approaches could you take to reduce run times of an optimizer?Note: There are 3 correct answers to this question.
- A. Split into multiple planning areas to support weekly vs. daily planning needs.
- B. Use non-overlapping networks by using subnetwork ID maintained at Location-Products to reduce the size of the problem.
- C. Increase the use of incremental lot size beyond the frozen horizon.
- D. Keep the number of fairshare segments small.
- E. Avoid using telescopic time buckets.
Answer: A,B,E
NEW QUESTION # 66
Which of the following are features of lag-based snapshots?Note: There are 2 correct answers to this question.
- A. Lag-based snapshots are created in the Configuration app for a fixed time range.
- B. Target key figures for these snapshots must have lag as a root attribute in its base planning level.
- C. Target key figures for these snapshots are exposed to the user in planning views.
- D. The number of lag-based snapshots are limited to nine levels.
Answer: A,B